![]() Project: Modesto Irrigation District Stanislaus County, California USA Equipment: Towable Soil Cement Plant for mixing cement and water to native soil to produce a soil cement slurry backfill material at high production rates, 200-250 T/hr (181-227 Metric T/hr) Note: The contractor successfully removed sandy-loam, native soil from the trench for the 60" (1.52M) diameter water pipe; processed the soil through the Soil Cement Plant adding cement and water; and used the resulting wet soil cement material (flowable backfill) for bedding around the pipe. |